102 'Falcon' NIR Blue, with SYP and Black Cab - DCC Sound
Mír Réamh-Ordú
Tá an mhír seo ar Réamhordú, agus meastar gurb é Q4, 2025
an dáta seachadtaMír Réamh-Ordú
Tá an mhír seo ar Réamhordú, agus meastar gurb é Q4, 2025
an dáta seachadtaHaving undertaken a programme of station refurbishment, improved its ticketing arrangements and introduced new on-track plant and shunting locomotives, in 1969 the still embryonic Northern Ireland Railways set out to improve the Dublin-Belfast ‘Enterprise’ service, by replacing the existing diesel railcar sets with a locomotive hauled service. Intended to reduce the time for the 180 km journey to just two hours, the NIR Class 101 (DL) locomotives were designed to run in a push/pull configuration, with a 270 ton 8-car set of BR Mk.2b stock, at a maximum speed of 80mph.
{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}